This is sort of in order of "closest to being finished" to "probably won't happen."
1. X-quilt
It has been machine quilted and is waiting for me up in Michigan. All it needs is binding!
2. Mystery Quilt
Again, all machine quilted and just needs binding. I'll be picking up these two quilts in May when I go up to Michigan for my sister's college graduation.
3. Snowflake quilt
Top is all done, needs quilting and binding.
4. Seville Quilt
Same thing, quilting and binding.
5. Shoes
Top needs to be finished, need to find and buy border fabric for this one.
6. Civil war quilt
Again, need to buy and find sashing and border fabric and finish putting the top together.
7. Railroad Quilt
HAND QUILTING. Seriously, I just need to take the quilt into the living room and work on it when I watch TV, instead of pinning on Pinterest.
I know that I can finish 1 and 2 before the end of June, and I think that getting 3 and 4 done is possible. Getting 5 and 6 all the way finished might be a stretch, but I will definitely get the tops done. 7 is the thorn in my side from long, long ago and I am going to get it done before the end of the summer because now that I have a queen sized bed, I can make good use of it!
Those are some great quilts...good luck with the finishing.
ReplyDelete